Projects under Construction

 

The Construction of  'Al-Sahaba' Sanctuary - The Southern Mazar / second stage: (A)

   

Owner (Client)

The Royal Committee for The Rehabilitation of AL-Sahaba Mosque's & Sanctuaries.

   

Designer:

Tibah Engineering Consultants

   

Supervisor:

Alpha Engineering Consultants   

   

Project Cost:

1.3 Million JD's

   

Project Description:

The Location: The Project is located in the Mazar. The area of the Sahaba's Tombs is very close to the Sanctuary of Ja'far bin Abi Taleb (may god have merci on his soul).
 

The Project's components: The Project is an extension of the previouse built Sanctuary, it is comprised of outer hallways, two Wodo' areas and outer works for arenas ramps and Stairs.
Works also include the construction of a multi purpose hall, A Building for the Royal Halls, the Main Entrance Building and the surrounding hallways, Stone Façades, Fountain works and landscaping. Th Projects area is 6000 m2.

   

Project Duration:

300 days

   

Percent of Completion:

95%

   
   
 
 

Construction of Backaldrin Arab Company Building/ Jordan (2004)

 
   

Owner (Client)

Backaldrin Arab Company/ Jordan

   

Designer:

Al Maw'el Engineering Consultants

   

Supervisor:

Al Maw'el Engineering Consultants   

   

Project Cost:

600 Thousand JD's

   

Project Description:

Project Location: The project is located on land no. 142, basin 5, Al-Manshiyah of Al-Mashti/ Al-Jeeza Lands.

Project Components: Construction of a cast on-site reinforced concrete Building, cast on-site, with distinguished Stone and Glass Facades, in addition to building a 12 meter high Steel Hanger as an extension. Works also include finishing and electromechanical components. The project's area in 1600 m2.

   

Project Duration:

365 Days

   

Percent of Completion:

95%

   
   
 
 

Construction of Khaleefa Commerce Complex/ Jordan (2004)

   

Owner (Client)

Rola Khaleefah & Partners Company

   

Designer:

Consolidated Consultants for Water & Environement/ Architect Ja'far Touqan

   

Supervisor:

Omega Engineering Consultants

   

Project Cost:

1.4 Million JD's

   

Project Description:

Project Location: It is Located on Land no.56, basin 7- Al-Bayad from Al-Jbeiha Lands.

Project Components: This 9-floor stone and concrete complex will have distinguished stone and glass facades, the over all area is 8062 m2 as follows:

-        2nd Basement: has the Car parking, services rooms and water well.

-        1st basement: has the car parking, service rooms, and storage.

-        Ground Floor: has the Main entrance Hall, commercial stores and related services.

-        Mezzanine floor: has Storage for the stores located on the ground floor.

-        The rest of the five floors: has Open Offices and preparation for the related services.

-        Landscaping: Open Areas, Boundary walls, walkways, planted areas and ramps.

   

Project Duration:

540 Days

   

Percent of Completion:

40%

   
   
 

Projects under Construction/ Project Management (Qatar)

 

Dukhan Housing Project (Fifth phase)/ Qatar (2005)

   

Owner (Client)

Qatar Real Estate Investment Co.

   

Designer:

AlEmar Contractors Engineers

   

Contractor:

Shannon Trading & Contracting W.L.L.
   

Supervisor:

MAUNSELL / AECOM.

   

Project Cost:

206 Million Qatar riyal/ 57 Million U.S. Dollars

   

Project Description:

The Location: The Project is located in the Mazar. The area of the Sahaba's Tombs is very close to the Sanctuary of Ja'far bin Abi Taleb (may god have merci on his soul).
 

The Project's components: The Project is an extension of the previouse built Sanctuary, it is comprised of outer hallways, two Wodo' areas and outer works for arenas ramps and Stairs.
Works also include the construction of a multi purpose hall, A Building for the Royal Halls, the Main Entrance Building and the surrounding hallways, Stone Façades, Fountain works and landscaping. Th Projects area is 6000 m2.

   

Project Duration:

425 days

   

Handover date:

1/6/2005

   

Percent of Completion:

30%

   
   
 

Projects under Maintenance

 

Al Bayader Security Centre Project (2004)

   

Owner (Client)

Directorate of Public Security / Buildings Department

   

Designer:

Directorate of Public Security / Buildings Department

   

Supervisor:

Directorate of Public Security / Buildings Department

   

Project Cost:

700 Thousand JD's

   

Project Description:

Project Location: Its is located on land no. 1708, basin 7, Al-Bayader of Amman Lands.
Project Components: Construction of a stone and concrete security center building with an area of 3258 m2, including outer works.

   

End Of Maintenance Date:

Project has been handed over preliminarily.

   
   
 

Projects Undertook By AlEmar Company in Jordan

 

Haydar Al Alami's Office Building (2004)

   

Project Description:

This project encompasses a commercial building (shops and stores) in Jebal Al-Husein, Firas Square. It includes construction of a reinforced concrete / stone multi-floor building consisting of underground car parking, stores and shops (ground floor), stores (mezzanine), first floor (offices) with a total area of 2300 m2. Faces are fitted with stone cladding, and finishing activities are included.

   

Duration:

345 days
   
Supervision: Jordan Islamic Bank / Eng. Ismail Bazyan’s Office
   
Project Cost: 840 Thousand JD's
   
 
 
 

Zahran Medical Laboratory (1987)

   

Project Description:

AL-Emar re-designed and rehabilitated this existing medical facility. Maintenance works are included.

   

Duration:

30 days
   
Supervision: By Owner
   
Project Cost: 20 Thousand JD's
   
 
 
 

Public Security Brigade Guards Building (1992)

   

Project Description:

Construction of the Public Security Brigade Guards’ Building, in the yard neighboring the Ministry of Education, with a total area of 886 m2. This building includes several dormitories, halls, a restaurant and a kitchen for the Brigade’s members.

   

Duration:

360 days
   
Supervision: Ministry of Education
   
Project Cost: 133 Thousand JD's
   
 
 
 

Mr. Shahadeh Al Tiwal's Farm (1995)

   

Project Description:

Construction of a swimming pool, yards and surrounding walls in Al-Zarqa, al-Dlail region.

   

Duration:

150 days
   
Supervision: By Owner
   
Project Cost: 123 Thousand JD's
   
 
 
 

Basem Hakim's Building (1995)

   

Project Description:

Construction of the structural works of a commercial building consisting of four floors in the Industrial Zone of Wadi Esseir, Amman, with a total area of 1250 m2.

   

Duration:

180 days
   
Supervision: The Jordanian Engineer Office
   
Project Cost: 100Thousand JD's
   
 
 
 

Small Size Project For the Embassy Of U.S.A (1998)

   

Project Description:

Construction and installation of a large steel satellite structure.

   

Duration:

60 days
   
Supervision: Ad hoc Committee, Embassy of the United State, Jordan.
   
Project Cost: 17 Thousand JD's
   
 
 
 

Extension of Royal Medical Services Directorate at Al Hussein Medical City (1999)

 

Project Description:

The project comprises extension of the Services Directorate Building by constructing and finishing the civil and Electro-mechanical works of a new building adjacent to the existing building. The new building includes 3 floors with a total area of 1100 m2.

   

Duration:

210 days
   
Supervision: Royal Engineering Corps.
   
Project Cost: 200 Thousand JD's
   
 
 
 

Ma'an Governorate Building/ Ministry Of Public Works & Housing (1999)

 

Project Description:

construction and finishing of a reinforced concrete / stone building consisting of two floors and a basement with a total area of 3152 m2, guard’s room (20 m2), mechanical, electrical and sanitary works, water tank (50 m3), septic tank (cesspit), asphalted yards, surrounding walls and concrete sunshade for the car park (200 m2).

   

Duration:

540  days
   
Supervision: Ministry of Public Works and Housing.
   
Project Cost: 700 Thousand JD's
   
 
 
 

Construction Of the Second battalion's building/ Private Police (3rd Stage)- Marka (2003)

   

Project Description:

These concrete and brick structures comprise the headquarters building (680.23m2), three dormitories (889.89m2), restaurant (797.33m2), repair workshop (339.99m2) and ammunition store (113m2), in addition to external works.

   

Duration:

420   days
   
Supervision: Directorate of Public Security / Building Department.
   
Project Cost: 850 Thousand JD's
   
 
 
 

Construction of Jabal Al-Hussein Offices/The Jordanian-Kuwaiti Bank (2004)

   

Project Description:

The Project comprises of one floor, including works of adjustments and finishing of architectural, mechanical, sanitary and electrical works according to the design and bill of quantities.

   

Duration:

30   days
   
Supervision: Jordanian Kuwaiti Bank
   
Project Cost: 20 thousand JD's
   
 

Residential Buildings

 

Mr. Ahmad Khammash Building (1986)

   

Project Description:

Construction and finishing of a private residence comprising two villas, each having three floors with a total area of 1200 m2.

   

Duration:

300 days
   
Supervision: Eng. Ahmad Khammash’s Office
   
Project Cost: 315 thousand JD's
   
 
 
 

Mr. Mohammad Abdullah Alkilani's Building (1986)

 
   

Project Description:

Construction and finishing of a private residential building with a total area of 1400 m2.

   

Duration:

330 days
   
Supervision: Eng. Emad Aqrouk’s Office
   
Project Cost: 260 Thousand JD's
   
 
 
 

Mrs. Zahiyah Jaber's Villa (1988)

 
   

Project Description:

Construction of the structural works of the building consisting of the basement (70 m2), ground floor (340 m2), external stone wall, and external works: slabs and walls.

   

Duration:

110 days
   
Supervision: Al Tabba‘a’s Engineering Office
   
Project Cost: 137 Thousand JD's
   
 
 
 

Dr. Mohammad Hajjaj's Villa (1993)

 
   

Project Description:

Construction and finishing of a building with Jama‘een stone cladding. The 760 m2-villa includes a basement and a ground floor with modern design, and constructed according to high engineering specifications. A 95 m3 water reservoir leveled with the basement is also built.

   

Duration:

365  days
   
Supervision: Mawshoor Engineering Office
   
Project Cost: 285 Thousand JD's
   
 
 
 

Mr. Edward & Mr. Charle Kishik Villa (1993)

 
   

Project Description:

Construction and finishing of a private residential complex of two attached (back-to-back) Villas with a total area of 1500 m2. Each villa includes three floors, two water tanks (200 m3). The work was completed with external works: walls and passageways.

   

Duration:

340 Days
   
Supervision: Eng. Zaki Sayed Ahmad’s Office
   
Project Cost: 110 Thousand JD's
   
 
 
 

Mr. Sameer Al Dina's Villa (1994)

 
   

Project Description:

Construction of the structural works of the building, which includes three floors with a total area of 1030 m2. The construction encompasses an interior swimming pool in the ground floor, and a water tank (130 m3) in the first floor, in addition to external retaining walls, surrounding walls and protection slabs.

   

Duration:

150 Days
   
Supervision: Eng. Zaki Sayed Ahmad’s Office
   
Project Cost: 100 Thousand JD's
   
 
 
 

Mr. Basem Hakeem Villa (1994)

 
   

Project Description:

Construction of the structural works of the building, which consists of a ground floor and a first floor with a total area of 530 m2. The external walls are fitted with Jama‘een stone cladding, in addition to the surrounding walls, outdoor slabs and a 60 m3-water reservoir.

   

Duration:

150 Days
   
Supervision: Eng. Munzer Al-Kelani’s Office
   
Project Cost: 70 Thousand JD's
   
 
 
 

Construction of Villa & Offices/ The Royal Palaces (1994)

 
   

Project Description:

Villa and offices located on Al-Aqaba shore, built of stone and include two floors, swimming pool guard rooms and landscaping.

   

Duration:

320 Days
   
Supervision: Ministry of Public Works and Housing / The Royal Palaces Works Directorate
   
Project Cost: 105 Thousand JD's
   
 
 
 

Mr. Tawfeeq Ghandour's Building (1995)

 
   

Project Description:

Construction and finishing of an additional floor for a villa with a total area of 350 m2. The work was completed with all civil and Electro-mechanical works.

   

Duration:

60 Days
   
Supervision: By Owner
   
Project Cost: 55 Thousand JD's
   
 
 
 

Engineer "Mohammad-Isam" Sha'ban Villa (2002)

 
   

Project Description:

Construction and finishing of a private residence comprising two (back-to-back) villas, each having three floors with a total area of 1300 m2. The works also include a circular swimming pool, a well for storing water (160m2), and landscaping.

   

Duration:

750 Days
   
Supervision: Eng. Khaled Zabalawi office
   
Project Cost: 500 Thousand JD's
   
 
 
 

Construction of Family & Children center for Development &  Training – Jabal AL Naser (2003)

 
   

Project Description:

This one-story building (1600m2) is being built of concrete and bricks, its four faces are to be finished with colored plastering and its works are to include surrounding walls, entrances and yards.

   

Duration:

300 Days
   
Supervision: Tibah Engineering Consultants
   
Project Cost: 425 Thousand JD's
   
 

Mosques

 

Al-Eman Mosque (1989)

   

Project Description:

construction and finishing of a three-story mosque complex (1200 m2) as follows:

  • Ground floor: a man’s praying space, ablution facility, water closet facility, Moazzin’s residence.

  • First floor: men’s and women’s praying spaces, Imam’s residence, Holy Quran Recitation Home and public library.

  • Mezzanine  : women praying space.

  • Tiled un-roofed yards and staircases.

  • Dome and 24-meter high minaret
    .

   

Duration:

300 days
   
Supervision: Ministry of  Awqaf and Islamic Affairs / Eng. Khaled Za’balawis’ Office
   
Project Cost: 175 thousand JD's
   
 
 
 

Al-Haj HAsan Mosque (1990)

 
   

Project Description:

Construction of the structural works of the three-floor mosque with a total area of 1700 m2, including 36 m-high minaret, three domes and external structural works: walls, yards and entrances.

   

Duration:

340 Days
   
Supervision: Al Tabba’a’s Engineering Office
   
Project Cost: 137 Thousand JD's
   
 
 
 

Construction of Prophet Shu'aib Mosque and Sanctuary (2000)

 
   

Project Description:

This project consists of the following components:
The mosque, minaret, women’s praying space, Imam’s residence, utilities, external works, underground water reservoirs, cesspit, Electro-mechanical works, walls and gates. Total area amounts to 1356 m2.

   

Duration:

450 Days
   
Supervision: Al - Mihrab for Islamic Architecture
   
Project Cost: 1 Million JD's
   
 
 
 

Hajj Mohammad Sha'ban Mosque (2002)

 
   

Project Description:

Construction and finishing works of a 480 square-meter three-floor mosque: ground floor - comprising the Imam’s residence, Holy Quran Recitation Home and utilities; first floor - main mosque’s praying space for men; second floor - women’s praying space.
The works also include implementation of external structures.

   

Duration:

365 Days
   
Supervision: Eng. Khaled Zabalawi’s Office
   
Project Cost: 200 Thousand JD's
   
 

Boundary Walls:

 

Construction For Retaining Wall for AlHusam For Plastic Industry (1989)

 
   

Project Description:

Construction of retaining walls of approximately 3-7.5 m high and 100 m long.

   

Project Duration:

55 days

   

Supervision:

Eng. Zaki Sayeed Ahmad’s Office

   

Project Cost:

20 Thousand JD's

   
   
 
 

AL Ma'wa Royal Palace Boundary Wall (1990)

 
   

Project Description:

construction of a surrounding four-meter high, 250-meter long wall with stone cladding on both sides, around Al-Ma’wa Royal Palace, Raghadan locality / Amman. All works were complete with required lighting and decorations.

   

Project Duration:

325 days

   

Supervision:

Ministry of Public Works and Housing / Royal Palace Works Directorate

   

Project Cost:

135 Thousand JD's

   
   
 
 

Boundary Walls of Duty Free Zone/ Aqaba (1994)

   

Project Description:

Construction of surrounding walls using fair face formwork style for the duty free zone / Aqaba, with a total length of 2300 m, particular cement painting for such formwork technique and steel reticulate above the surrounding wall.

   

Project Duration:

150 days

   

Supervision:

Ministry of Public Works and Housing

   

Project Cost:

235 Thousand JD's

   
   
 
 

Construction Of Boundary Walls for Mr. Abdullah Abu-Khadejah's Site (1995)

   

Project Description:

Construction of retaining walls: 12m high and 90m long. This project is located in Abu Nusseir, Amman.

   

Project Duration:

180 days

   

Supervision:

Iwan Consulting Engineers Group

   

Project Cost:

320 Thousand JD's

   
   
 

Clubs:

 

Public Security Officer's Club (1992)

 
   

Project Description:

Construction and finishing of a club structure for the PSD’s officers. The main building’s total area is 2650 m2; it includes:
a-  Basement: theatre and cinema hall, changing room, toilets, shower rooms and sauna.
b-  First floor: a ballroom and restaurants.
c-  Three duplicate floors having hotel-like suites and one annex to the main building for an outdoor cafeteria. External works include landscaping and swimming pools.

   

Project Duration:

500 days

   

Supervision:

Directorate of Public Security / Buildings Department

   

Project Cost:

800 Thousand JD's

   
   
 
 

Multi Purpose Hall/ The Royal Automobile Club of Jordan (1995)

 
   

Project Description:

Construction and finishing of a 1000 m2 hall complete with all civil, mechanical and electrical works.

   

Project Duration:

250 days

   

Supervision:

The Royal Automobile Club of Jordan  / Sigma Architects Engineers

   

Project Cost:

300 Thousand JD's

   
   
 

Hotels:

 

Hilal Centre Project(1993)

 
   

Project Description:

Construction of the structural work of a stone building which includes a basement with an area of 750 m2 (car parking) and 7 floors with a total area of 3000 m2, in addition to construction of 12-meter high external retaining walls and a water tank (145 m3).

   

Project Duration:

240 days

   

Supervision:

Binaa’ Consulting Engineers

   

Project Cost:

500 Thousand JD's

   
   
 

Schools:

 

Um Al-Basateen Secondary Schoole for Girls (1988)

 
   

Project Description:

Construction and finishing of the main building (2750 m2). It is a three-story building with 28 classrooms, a library, scientific labs and teaching staff offices. Annexed to the building is a vocational workshop with an area of 300 m2, and a water closet utility (150m2). Paved yards and playgrounds of 7000 m2 are also implemented along with external works incorporating retaining walls and staircases.

   

Project Duration:

515 days

   

Supervision:

Ministry of Education / Engineering Section

   

Project Cost:

525 Thousand JD's

   
   
 

Hospitals:

 

Construction Of Urology at Al Hussein Medical City/ Services Directorate (1998)

 
   

Project Description:

the project consists of construction and finishing one two-floor main building with a total area of 2878 m2 that includes four operation theatres, X-ray room, doctors’ rooms, nurses’ rooms, pharmacy and patient waiting rooms.
The above building was completed with all civil and Electro mechanical works as follows:

  1. Internal and external lighting systems.

  2. Telecommunication systems.

  3. HVAC Systems.

  4. Cold and hot water systems.

  5. Fire fighting and alarm systems.

  6. Power plant.

  7. Steam plant.

  8. Medical gases.

  9. External works: passageways and sidewalks, carparking, etc.

  10. Sewage system.
     

   

Project Duration:

240 days

   

Supervision:

Royal Engineering Corps.

   

Project Cost:

1.2 Million JD's

   
   
 
 

Treabeel Medical Clinic (2003)

 
   

Project Description:

Treabeel Medical Clinic consists of three main buildings with a total area of 768 m2, in addition to several structures as follows:

  1. Main clinic building

  2. Water softener building (105m2 )

  3. Power planthouse (28m2) consisting of two rooms one for the generator, the other for the circuit breakers

  4. Cesspool (80 m3)

  5. Access road (1850m2), base-course only


 This construction has all utilities including the following electro-mechanical systems:

  1. Internal and external lighting systems.

  2. Telecommunication systems.

  3. HVAC Systems.

  4. Cold and hot water systems.

  5. Fire fighting and alarm systems
     

     

   

Project Duration:

220 days

   

Supervision:

Directorate of Military Housing and Construction / United State Government U.S. Corps Of Engineers.

   

Project Cost:

500 thousand JD's

   
   
 

Factories:

 

Paper & Cartoon Factory (a joint-stock company) (1990)

 
   

Project Description:

This project consists of construction and finishing of the following structures with a total area of 2500 m2:

  1. Construction of reinforced concrete floor slabs, mechanically polished.

  2. Construction of machines’ mounts according to minute details.

  3. Construction of concrete fair face 8m-high columns with upper beams.

  4. Construction of five-meter high retaining walls.

  5. Construction and finishing of stores, warehouse and office building with an area of 750 m2.

  6. Construction of asphalted (paved) yards with an area of 11500 m2.
     

   

Project Duration:

160 days

   

Supervision:

Jordan Consultant Company

   

Project Cost:

700 Thousand JD's

   
   
 
 

Samhan & Za'balawy's Factory (1994)

 
   

Project Description:

construction of the structural works of a factory consisting of three floors (300 m2 each) with a total area of 2700 m2. All the faces of the factory are made of fair face concrete, in addition to its roof slabs. The construction also includes 220 m3 water reservoirs besides the external works: retaining walls, concrete yards and car parking.

   

Project Duration:

340 days

   

Supervision:

Eng. Khaled Za’blawi’s Office

   

Project Cost:

250 thousand JD's

   
   
 

Hangars:

 

Construction of Public Security Building (1992)

 
   

Project Description:

Construction and finishing of the civil works of a one-story building (400 m2) with a 600-square-meter steel structure hangar for the maintenance of the PSD’s helicopters and a polished concrete hangar floor slab
   

Project Duration:

150 days

   

Supervision:

Directorate of Public Security / Buildings Department

   

Project Cost:

100 Thousand JD's

   
   
 
 

Yousef Nader Company's Storehouses (1991)

 
   

Project Description:

Construction of all civil works including mechanically polished floor slabs and paving of external yards.
   

Project Duration:

70 days

   

Supervision:

Eng. Haddad’s Office

   

Project Cost:

50 Thousand JD's

   
   
 
 

Zarqa International Exhibition/ Municipality of Zarqa (1997)

 
   

Project Description:

Construction and finishing of all civil, mechanical and electrical works of a steel structure with a total area of 4976 m2. The multi-purpose construction will be used for exhibitions and parties, among others. The hangar includes construction of a mezzanine structure for offices and general services.
   

Project Duration:

300 days

   

Supervision:

Zarqa Municipality

   

Project Cost:

500 Thousand JD's

   
   
 
 

Commercial & Industrial Company Hangers/ Ford (2000)

 
   

Project Description:

Construction of a storehouse with a total area of 1500 m2 in the free zone, Zarqa.
   

Project Duration:

150 days

   

Supervision:

By Owner

   

Project Cost:

55 Thousand JD's

   
   
 
 

Construction Of Steel Hangar at the Royal Palaces (2000)

 
   

Project Description:

Construction of a steel-structure hangar-shaped storehouse at the Royal Palaces.
   

Project Duration:

40 days

   

Supervision:

Ministry of Public Works and Housing / The Royal Palaces Works Directorate

   

Project Cost:

85 Thousand JD's

   
   
 

Water Tanks:

 

Construction Of two water tanks (300 m3) in the Royal Palaces (2000)

 
   

Project Description:

construction of two-water tanks of 300 m3 in the Royal Palaces.
   

Project Duration:

60 days

   

Supervision:

Ministry of Public Works and Housing / The Royal Palace Work Directorate

   

Project Cost:

50 Thousand JD's

   
   
 

Bridges:

 

Wadi Mousa Pump Station Bridge

 

 

   

Project Description:

Construction of a two semi-circular arch bridge that complements the work done recently to build a water pump station (with financial support from USAID in Jordan) to enable crossing over a critical area in the Wadi Mousa Valley (at the gate of Petra).
   

Project Duration:

6 months

   

Supervision:

Dar Al-Omran

   

Project Cost:

250 Thousand JD's